References

locality
investor
term 4.2021 - 12.2021

locality
investor
term 3.2020 - 5.2022

locality
investor
term 7.2021 - 6.2023

locality
investor
term 5.2011 - 5.2022

locality
investor
term 6.2020 - 5.2021

locality
investor
term 12.2019 - 12.2020

K A M A headquarters

locality Prague
investor K A M A spol. s r.o.
term 4.2019 - 5.2020

Our company successfully completed the reconstruction and superstructure of the headquarters building for the K A M A spol. s r.o. company in Prague.

The work was divided into two phases. Within the scope of the first phase, which was completed regardless of the Client’s full operations at the time, the superstructure of the 2nd -floor production and administrative parts of the building was completed. The building was completed insulated and a wooden façade was added to the administrative space. Operations were then partially transferred to the newly built floor and, as part of the second phase of the work, the existing areas on the 1st floor, including the company store, were reconstructed at the same time. 

K A M A headquarters

PET/CT workplace, Pardubice Regional Hospital

locality Pardubice
investor
term 3.2020 - 9.2020

Our company successfully completed the construction of a new building as part of the PET/CT workplace of the Pardubice Regional Hospital. As an addition to the workplace, new areas were built, including a waiting room, a patient prep area, employee day-rooms, a CT examination room, storage areas, a physician’s workroom, an office, and social facilities. The following rooms were also completed for the functionality of the local departments: radiopharmaceutical reception, material filter, drug preparation, application room, drug control, and personnel filter.

This project took 6 months to complete.

PET/CT workplace, Pardubice Regional Hospital

KODYS, spol. s r.o. headquarters

locality Prague
investor KODYS, spol. s r.o.
term 4.2019 - 1.2020

Our company, RONELI Construction SE, completed work on the “New Headquarters for the KODYS, spol. s r.o. Company”.  

The company’s original administrative building could be found on a plot situated in Prague 5, next to Motol Castle. This building was completely demolished and a new, modern three-storey headquarters for the KODYS company was built in its place.

Apart from the demolition of the previous building and the construction of its replacement, part of our commission also included securing network hook-ups as well as the construction of access roads, 25 parking spots, and asphalt paving. 

KODYS, spol. s r.o. headquarters

Reconstruction of the production halls for the Očenášek - Mikulka, spol. s r.o. company

locality Prostějov
investor Očenášek - Mikulka, spol. s r.o.
term 9.2019 - 3.2020

Our company successfully completed work on the commission “Energy Savings at the Očenášek - Mikulka, spol. s r.o. Compound”. Over six months, the construction of three production halls in the industrial park located on the edge of Prostějov was completed. Part of this project included updating the perimeter and roof covering, including the auxiliary steel construction and roofing components, the thermal insulation structure, the exterior filler openings, and the installation of a new lightning rod. This project was unique in that the work was carried out regardless of the full operation of the Client and their tenants.

Reconstruction of the production halls for the Očenášek - Mikulka, spol. s r.o. company

Completion of a hall for MONTS s.r.o.

locality Hradec Králové
investor MONTS s.r.o.
term 8.2018 - 11.2019

Our company completed the construction of a new industrial hall, including an administrative extension, for the company MONTS s.r.o. in Hradec Králové.
Apart from the hall and the administrative sections, part of the work completed by our company also included the construction of roads on the premises, asphalt paving, the relocation of tracks/network hook-ups, and the construction of an outdoor stationary crane and railway tracks.
The project was unique in that both the administrative area and the hall were designed according to the Passive House Standard.
Construction was completed in accordance with the contractual work schedule and it took 13 months to finish.

Completion of a hall for MONTS s.r.o.

Superstructure and reconstruction of the Nuselská Primary School in Havlíčkův Brod

locality Havlíčkův Brod
investor Město Havlíčkův Brod
term 8.2018 - 4.2019

The company RONELI SE successfully completed the construction-related commission, “Reconstruction of the Nuselská Primary School in Havlíčkův Brod”. This commission entailed the renovation of the 5th floor and the reconstruction of several existing classrooms on the 4th floor of the school.

Thus the school received a new digital planetarium, a natural sciences classroom, and a multifunctional classroom with a 2D projector. Part of the original floor plan of the roof was turned into an outdoor study area, part of which includes a greenhouse and space for watching the stars.

All the work was completed while school was in session, and in combination with the character of the commission, great emphasis was placed on, among other things, the safety not only of our employees but primarily the safety of the children and the employees of the school.

Superstructure and reconstruction of the Nuselská Primary School in Havlíčkův Brod

Central pavilion for the Primary School in Opatovice nad Labem

locality Opatovice nad Labem
investor Obec Opatovice nad Labem
term 6.2018 - 6.2019

Our company completed the construction of a new central pavilion for the Primary School in Opatovice nad Labem. The central pavilion connects the 4 existing school buildings, creating a single primary entrance onto the grounds. Central lockers were built for the students on the first floor, and four new basic classrooms and one language skills lab were built on the 2nd and 3rd floors. Thus, operationally speaking, the central pavilion became the traffic heart of the school. The fact that it includes barrier-free access goes without saying. This commission took 11 months to finish.

Central pavilion for the Primary School in Opatovice nad Labem

Hall for the SOU (Vocational School) building in Pilsen

locality Plzeň
investor SOU stavbní Plzeň
term 1.2018 - 12.2018

Our company completed the construction of a new hall for the vocational training centre in Pilsen. The hall serves as a practical learning area for the SOU students, and the commission for this project was made by the school. The hall and its steel construction were designed as a single object segmented into four learning spaces with utility and sanitary facilities. The entire building is lit by 48 skylights.

Hall for the SOU (Vocational School) building in Pilsen

Reconstruction of a catering facility and roof cladding of a production hall

locality Pilsen, CZ
investor DRIESSEN Czech s.r.o.
term 02.2018 – 06.2018

Our company has successfully completed the “Reconstruction of the catering facility and roof cladding” at DRISSEN Czech s.r.o. in Pilsen. The part of the contract entrusted to our company included a complete reconstruction of the interior of the catering facility, the delivery of the kitchen equipment and the reconstruction of 5000 m2 of the roof cladding of the production hall.

Reconstruction of a catering facility and roof cladding of a production hall

Construction of a development and testing centre

locality Klecany, CZ
investor Avaps s.r.o.
term 11.2017 – 03.2018

The building, designed as a single-storey steel structure clad in sandwich panels and with a saddle roof will be used for the development and testing of new products. Besides the furnace, the hall also features a two-storey block housing a control room, changing rooms with sanitary facilities, and a training room. About 1500 m2 of new paved areas have been built around the test centre. The project was completed in four months, with most of the work having been done in winter.

Construction of a development and testing centre

Reconstruction and completion of the Impact Hub co-working centre in Brno

locality Brno, CZ
investor Impact Hub Brno
term 05.2017 – 12.2017

Our company has completed an extensive reconstruction of the Impact Hub Brno facility, where new offices and conference rooms with an area of more than 1700 m2 were built. As a result, Impact Hub Brno has become the largest shared space in Europe and the second largest shared space of the Impact Hub network in the world.

Reconstruction and completion of the Impact Hub co-working centre in Brno

Reconstruction of Pavilion E of the Hamza Specialised Rehabilitation Centre for Children and Adults

locality Košumberk, CZ
investor Hamza Specialised Rehabilitation Centre for Children and Adults
term 05.2017 – 11.2017

As the name suggests, the project was aimed at the enhancement of Pavilion E of the Hamza Specialised Rehabilitation Centre for Children and Adults. The pavilion is now used as a children’s ward. The reconstruction carried out by our company was completed in five months.

Reconstruction of Pavilion E of the Hamza Specialised Rehabilitation Centre for Children and Adults

Construction of a production hall for AVAPS

locality Klecany, CZ
investor AVAPS s.r.o.
term 04.2017 – 09.2017

This was a contract for the construction of a new two-bay production hall with a total usable area of 2376 m2, connected to the existing office building. The building is used for the production of fire shutters and smoke barriers. The western bay is single-storey and the eastern bay is partly two-storey, with an office block and a surface treatment line. The construction project was completed in five months.

Construction of a production hall for AVAPS

Reconstruction of laboratories

locality Kutná Hora, CZ
investor Philip Morris ČR a.s.
term 04.2017 – 06.2017

The comprehensive reconstruction of the laboratories of Philip Morris ČR a.s. in Kutná Hora included the replacement of all installations and the realisation of new surface finishes and assemblies. In this contract, we coped successfully with a large volume of work on a relatively small ground plan, which placed high demands on the coordination of individual activities.

Reconstruction of laboratories
Previous page / Next page (1/2)